Orka Logo White

Discover our project

Sorik Marapi Geothermal Sorik Marapi Geothermal
  • Front Slide 1

    PT Sorik Marapi Geothermal Power

    One of the largest developing geothermal projects in Indonesia. This project is located in Mandailing Natal Regency, North Sumatera Province. KS Orka acquired majority shares of the company in mid-2016 and since then the project has completed drilling program for 18 wells and confirmed at least 55 MW proven resources. The project aims to connect 45 MW power to PT PLN grid by end of September 2019.

  • Front Slide 1

    PT Sokoria Geothermal Indonesia

    Sokoria geothermal power project is located in Ende, Flores Island, East Nusa Tenggara Province. The project was stagnant before KS Orka acquired the majority shares in early 2017. Since then the project has completed exploration phase by conducting drilling for 5 wells and confirmed at least 10 MW resources. The project is currently in the construction for power plant for its first unit of 5 MW.

  • Front Slide 1

    KS Orka Renewables

    KS Orka currently has three projects in Indonesia: two concession areas and one PSP+E area. We are aiming to develop 1000 MW by 2022 by applying our business model and technology.

QR Code Orka

Scan me to Download Our Profile

Read Us

KS Orka is a project developer focusing exclusively on the development of geothermal resources. Our team has over 30 years of collective experience in developing, managing and financing geothermal energy and power projects.

KS ORKA acknowledges the potential of geothermal energy in Indonesia. Our vision in Indonesia is to deliver geothermal power in a clean, safe and responsible way for the benefit of the people of Indonesia. We do that by applying KS Orka’s innovative Incremental Business Model to develop and accelerate geothermal power projects, with a target of up to 1,000 MW in Indonesia by 2022.

KS Orka applies the modular power plant technology from Kaishan Manufacture, our sponsor, in our projects. The technology allows us to develop geothermal resources in more cost efficient and environmentally friendly manner.

Orka Logo Circle

Where We Are

KS Orka is prioritizing the geothermal development in Indonesia and constantly looking for more opportunities to expand by applying its unique business model.

Within three years since mid-2016, KS Orka has acquired two concession areas with total potential 270 MW and one preliminary survey and exploration area with potential up to 110 MW.

By applying the Incremental Model, KS Orka is constantly looking for new opportunities to develop and expand in Indonesia with target of 1,000 MW by 2022.

Peta Orka
Photo Selection Orka
  • Gallery Image #1

    August (2016)

    KS Orka acquired

    95%

    Shares of PT Sorik Marapi Geothermal Power

  • Gallery Image #2

    October (2016)

    1st

    Well drilling in Sorik Marapi Geothermal Power Plant

  • Gallery Image #2

    January (2017)

    95%

    Shares of PT Sokoria Geothermal Indonesia

  • Gallery Image #2

    March (2017)

    Well Testing began on Wellpad A, Sorik Marapi Geothermal Power Plant

  • Gallery Image #2

    August (2017)

    50MW

    PT SMGP submitted Feasibility Study Result to PT PLN and Ministry of Energy and Mineral Resources confirming at least 50 MW proven resources based on drilling activities on Wellpad A

  • Gallery Image #2

    October (2017)

    1st

    Drilling of first well in Sokoria Geothermal Power Plant

  • Gallery Image #2

    November (2017)

    1st

    PT SMGP began construction of Power Plant for First Unit in Wellpad A

  • Gallery Image #2

    December (2017)

    Established and owned

    90%

    shares of PT Samosir Geothermal Power

  • Gallery Image #1

    February (2018)

    1st

    Well testing on Sokoria Geothermal Power Plant

  • Gallery Image #2

    June (2018)

    20 MW

    The construction of First Phase of Unit 1 Sorik Marapi Geothermal Power Plant for maximum 20 MW was completed

  • Gallery Image #2

    August (2018)

    18 Wells

    Were drilled on 5 wellpads on Sorik Marapi Geothermal Power Plant

  • Gallery Image #2

    August (2018)

    05 Wells

    Were drilled on 1 wellpad in sokoria geothermal power plant

  • Gallery Image #2

    February (2019)

    150 KV

    Transmission line connecting SMGP substation and PLN substation is ready

  • Gallery Image #2

    March (2019)

    SMGP and PLN signed agreement for PLN to provide

    30 MVA

    power for backfeeding

  • Gallery Image #2

    May (2019)

    The Feasibility Study result for Sokoria Geothermal project has been approved by the Minister or Energy & Mineral Resourcest

  • Gallery Image #2

    July (2019)

    SMGP is currently connecting

    15 MW

    power via 150 kV to PLN grid

     
    QR Code Orka Product

    Scan me to Download Our Product Brochure

    Read Us

    KS Orka applies the modular power plant technology from Kaishan Manufacture, our sponsor, in our projects. The technology allows us to develop geothermal resources in more cost efficient and environmentally friendly manner.